Skip to main content
George Group logo George Group Home Foshan Factory Direct

Custom Aluminium Casement Windows

Made-to-measure aluminium casement windows — thermal-break frames, friction stays, multipoint locking, Low-E glazing and RAL finishes, built to your schedule in Foshan.

George Group builds custom aluminium casement windows to your window schedule in Foshan — opening lights, fixed panels, glazing bars, hardware, glazing and finish specified together before production. Standard production is 30–45 days after drawing approval, with mixed-container shipping worldwide FOB or DDP.

Lead time
30–45 days after approval
Minimum order
No fixed MOQ with mixed shipment
Customization
Made to your opening schedule
Shipping
FOB or DDP worldwide

Custom Aluminium Casement Windows with Opening, Hardware and Glazing Specified Together

A made-to-order casement window system — fixed and opening lights, frame, hinges and friction stays, glazing, handles and seals drawn together to your finished opening and market.

A casement window has to balance ventilation, weather sealing and easy operation. Hinge position, opening direction, friction stay, handle, glass weight and frame stiffness all affect how the window performs after years of daily use. Ours are drawn around your opening schedule, with fixed and opening lights, dimensions and hardware approved before production.

The white Georgian-bar composition shown here pairs two inward-opening lights with a deep interior sill. Aluminium systems can combine thermal-break profiles, insulated Low-E glazing, multipoint locking and coordinated finishes for your climate and market. Every unit is labelled by room and opening number and can ship with your wider door and window order.

  • Fixed and opening lights drawn to your finished opening in millimetres
  • Side-hung, paired and fixed-plus-opening configurations
  • Thermal-break aluminium with double or triple Low-E glazing
  • Friction stays, multipoint locks and coordinated handles
  • Georgian bars, screens and project-specific finishes
  • Room-and-opening labels with mixed-container shipping available
Chat on WhatsApp

Full specification

Dimensions, aluminium systems, glazing, hardware, finishes and ordering terms — final values are fixed to the selected system and confirmed on your shop drawings.

Specifications
ItemStandard specification
Made-to-measure openingEach unit is drawn to your finished structural opening in millimetres, with frame allowances, mullion positions and installation clearances shown on the shop drawing.
Typical size rangeHinged aluminium windows commonly run 400–1,500 mm wide and 400–2,400 mm high; final opening-light size is checked against profile, glass weight and hardware capacity.
Opening layoutsSingle or paired side-hung lights, fixed-plus-opening combinations and multi-light assemblies, with mullions and glazing bars aligned across the composition.
Swing & handingInward or outward opening, left or right hinges and handle positions are marked on every elevation to prevent production and installation reversals.

Material & finish samples

Frame colours and glazing options for these casement windows — physical finish chips and glass samples are available for approval before production.

Matt black aluminium, material sample

Matt black aluminium

Powder-coated frame finish

White aluminium, material sample

White aluminium

Powder-coated frame finish

Grey aluminium, material sample

Grey aluminium

Anodised frame finish

Clear glazing, material sample

Clear glazing

Toughened or laminated options

Low-E glazing, material sample

Low-E glazing

Double or triple insulated units

Frosted glazing, material sample

Frosted glazing

Privacy glass option

Materials & construction

The complete window assembly: aluminium profiles, insulated glazing, hinges, friction stays, locking, seals and installation details designed to work together.

  • Opening lights designed around glass weight

    The frame, hinges, friction stays and locking are selected after the opening-light size and glazing build-up are known. This prevents an oversized or heavy sash from being paired with unsuitable hardware.

  • Ventilation without losing the weather line

    Swing direction, opening restriction, seals and sill drainage are specified together. The aim is controlled ventilation when open and a continuous, well-documented seal when closed.

  • Grids aligned across fixed and opening lights

    Georgian bars and mullions are drawn across the full composition, so fixed and opening panels share one visual rhythm rather than appearing as unrelated units.

  • Every opening stays identifiable

    Units are labelled by room and opening number, with hardware and packing references following the same schedule from production through installation.

Certifications & compliance

System-specific compliance and test documentation for your destination market — glass safety, component testing and factory quality records confirmed per order.

  • ISO 9001 factory

    ISO 9001 factory

    Quality-managed, audited production processes

  • CE · EN 14351-1 options

    CE · EN 14351-1 options

    System-specific window documentation confirmed for the destination market

  • EN 12150

    Tempered safety glass

    Applicable glass test documentation available by specification

  • ANSI Z97.1

    US safety glazing options

    Certified glass availability confirmed for the selected build-up

  • SASO options

    SASO options

    Saudi conformity documentation on request

  • SGS-tested components

    SGS-tested components

    Component or system test reports confirmed per order

Customization options

Every casement window is specified to order. The options below are settled on the shop drawing and confirmed against physical samples before production, so the approved specification is what the shipment delivers.

Dimensions
opening width and height, frame depth, mullion positions and installation clearances in millimetres.
Operation
single or paired side-hung lights, fixed-plus-opening layouts, inward or outward swing and handing.
Glazing
double or triple units, Low-E, argon, warm-edge, toughened, laminated, tinted or frosted glass.
Hardware
hinges, friction stays, restrictors, multipoint locks, handles and keyed options.
Design
Georgian bars, custom grid spacing, RAL colours, anodising, wood-grain and coordinated hardware.
Accessories
insect screens, integrated blinds and compatible sill or reveal details.
Documentation
room-by-room elevations, opening numbers, hardware positions and packing references.

Want every detail built your way? Talk to us — consultation is free.

Chat on WhatsApp

Casement, sliding or fixed: choosing the window for the opening

As a one-stop factory for the whole home, we supply the full range of window systems so you can coordinate them with the other materials in your project. The choice depends on ventilation, clear view, available space, operation and budget.

Casement
the opening light swings on side hinges and can provide a large ventilated area with a clear closing perimeter. Swing clearance and suitable hinges, stays and locking are essential.
Sliding
panels move within the frame plane, so no swing area is required. Ventilation is limited by the panel arrangement, while furniture and circulation can be placed closer to the window.
Fixed
no moving hardware and the clearest uninterrupted glass area, but no ventilation. Fixed lights can be combined with casement units to balance view, airflow and cost.
Our advice
choose casement for controlled ventilation and a full perimeter closing action, sliding where swing space is restricted, and fixed panels where the view matters and ventilation is provided elsewhere. For openings sized for sliding doors, see our custom sliding glass doors.

Packaging and shipping

Frames are protected and braced, glazed units are packed separately with edge protection, and hardware is boxed by opening number. Glass never carries the weight of frames or surrounding cargo. Every package follows the approved schedule.

Loading is planned in Foshan and photographed before the container is sealed. Windows can travel with the rest of your project in one mixed shipment, under one packing list and delivery window, FOB from our port or DDP to your door.

  1. Shop drawings confirmed

    Opening sizes, fixed and opening lights, swing, glazing, grid, hardware and finish are approved before production.

  2. In-production photos

    You receive production records at key stages, including profile preparation, frame assembly, glazing and hardware fitting.

  3. Pre-shipment inspection

    Frames are checked against the drawings; opening, locking and closing alignment are tested, and dimensions and component counts are verified.

  4. Packing list by opening

    Packages are numbered by room and opening, and the packing list doubles as the installation sequence.

  5. Container loading photos

    Bracing, separation and load order are photographed before the container is sealed.

  6. After-delivery support

    Report transit damage with photos within 7 days; replacement components or panels are assessed against the approved drawing and supplied accordingly.

Installation and maintenance

Your local installer should verify the finished opening, structural support, sill level and drainage before fitting. Frames must be installed plumb and square, opening lights adjusted after glazing, and tracks or drainage paths kept clear during construction.

Clean frames and glass with mild non-abrasive products, keep drainage openings clear, and check hinges, friction stays, locking points and seals periodically. Replacement hardware and service parts can be ordered against the original schedule.

Where it works best

Where custom casement windows are worth specifying — villas, apartments, hotels, character renovations and repeatable residential developments.

Villas and character homes

Paired casements and Georgian bars suit garden-facing rooms and character interiors, with swing, sill and surrounding finishes coordinated to the opening.

Apartments and developments

Repeatable unit types use one approved drawing set, consistent finish batches and unit-by-unit labels for coordinated delivery and installation.

Hotels and guest rooms

Opening lights can be specified with suitable glazing, restrictors, locking and replaceable service hardware for daily guest use.

Project buyers and distributors

A documented system, repeatable finishes and opening-specific packing support project supply, display units and phased reorder programmes.

FAQ

Questions importers ask us first

Straight answers on minimum orders, lead times, shipping and payment — before you commit.

Ivana Li, Senior Sales Director at George Group

Ivana Li

Senior Sales Director

Ten years focused on the global furniture and building-materials market, with deep project experience — you speak to her directly on WhatsApp.

Replies within one working day

Still have a question?

Send your list and get a costed, itemised answer — no obligation, no sales pressure.

Chat on WhatsApp
Can you make casement windows to my exact opening size?

Yes. We work from your finished structural opening and produce shop drawings with frame allowances, fixed and opening lights, swing and installation clearances in millimetres. Final dimensions and handing are approved before production.

Can casement windows open inward or outward?

Yes, depending on the selected system. We confirm swing direction, hinge side, handle position, screens, furniture clearance and exterior drainage on the drawing before production.

Are thermal-break aluminium frames available?

Yes. Polyamide thermal-break systems separate interior and exterior aluminium to reduce heat transfer and condensation risk. The exact profile series is selected according to opening-light size, glazing and destination requirements.

How large can an opening casement leaf be?

Hinged aluminium windows commonly fall within 400–1,500 mm wide and 400–2,400 mm high, but each opening light must be checked against profile, glass weight and hardware capacity. We confirm the workable combination on the shop drawing.

Can you add Georgian bars and insect screens?

Georgian-style grids, insect screens, opening restrictors and integrated blinds are available on compatible systems. Grid alignment, screen position and swing direction are coordinated on the drawing.

What glazing options are available?

Double or triple insulated glazing, Low-E coating, argon fill, warm-edge spacers, toughened or laminated safety glass, and clear, tinted, frosted or patterned options. The build-up is selected for your climate, safety and privacy requirements.

What certifications and test reports can you provide?

Documentation is confirmed for the selected system and destination. Options can include CE/EN 14351-1 documentation, EN 12150 or ANSI Z97.1 glass records, SASO documentation and component test reports. Performance figures apply only to the tested configuration.

What is the minimum order and lead time?

There is no fixed MOQ when windows ship with other categories in a mixed container; doors-and-windows-only orders are normally planned around one full container. Production is typically 30–45 days after drawing and sample approval, or 45–60 days for special systems, glazing or grids.

How much do custom aluminium casement windows cost?

Pricing follows the opening schedule and system specification. The main drivers are overall size, fixed/opening layout, aluminium system, glazing, hardware, grid design, finish and accessories. Send your sizes, quantities, destination and preferred configuration for an itemised quotation.

Ready to price your project?

Send the brief today and get a costed, itemised proposal — no obligation, no sales pressure.

Free quotation

Get your free quote in 24 hours

Tell us the categories, quantities and destination port. Our sales director replies personally.

What happens next

  1. You send the list

    Categories, quantities, destination port

  2. We cost it line by line

    Itemised quotation within 24 hours

  3. You decide

    No obligation, no sales pressure

We send quotations and photos straight to this number.

Chat on WhatsApp

Fields marked * are required.

We use your details only to answer this inquiry. No newsletters, no sharing.

Free quotation

Get your free quote

Name and WhatsApp number are all we need — a coordinator replies within one working day.

We send quotations and photos straight to this number.

Fields marked * are required.